Installations

Sites running on JetWash equipment

Each project starts with a free site review: bay dimensions, drainage, water and power. Below are typical set-ups and what they required.

JETWASH S3 installed at a standalone forecourt bay

JETWASH S3

Standalone forecourt bay

  • Bay7.2 × 4.0 m concrete pad
  • Utilities3-phase 380V, 25 mm water line, trench drain
  • Build timePad to first wash in 6 weeks
JETWASH S1 installed at a dealership service yard

JETWASH S1

Dealership service yard

  • BayExisting covered bay, retrofitted
  • UtilitiesSingle-phase, recycled water loop
  • Build timeInstalled and commissioned in 4 days
JETWASH S360 PRO installed at a fuel station, two-bay site

JETWASH S360 PRO

Fuel station, two-bay site

  • BayTwin bays sharing one plant room
  • Utilities3-phase, heated water package
  • PaymentsKiosk with card, contactless and QR
JETWASH S3 installed at a fleet depot

JETWASH S3

Fleet depot

  • BayDrive-through with barrier arm
  • UtilitiesWater recycling, freeze protection
  • OperationDriver PIN codes, monthly fleet billing

Send us photos and dimensions of your plot and we will mark up a layout with utility positions before you spend anything.

Request a free site review